Engineered wood and parquet
Herringbone, chevron and straight plank laying in engineered oak and other timbers. Set out from the centre of the room so the cuts land at the edges where they belong.


Electra Street, Abu Dhabi
Flooring is measured per square metre, but it is won or lost on the subfloor. A level, dry base is the difference between a floor that stays flat and one that lifts at the joints within a year.
We supply and lay engineered wood, laminate, luxury vinyl and carpet. Which one is right is usually decided by the room rather than by taste: bathrooms and kitchens want vinyl, bedrooms often want carpet, and living areas are where engineered wood and parquet earn their cost.
Every job includes checking and preparing what is underneath. We will tell you if the existing floor needs levelling before we quote the covering, because finding it on installation day helps nobody.
What we do
Herringbone, chevron and straight plank laying in engineered oak and other timbers. Set out from the centre of the room so the cuts land at the edges where they belong.
Click-system laminate in wood and stone effects — the practical choice where you want the look of timber at a lower cost and with a harder wearing surface.
LVT planks and sheet vinyl for kitchens, bathrooms, clinics and offices. Water resistant, quiet underfoot, and the sensible answer anywhere that gets wet.
Wall-to-wall carpet and carpet tiles with underlay, gripper and proper stretching, plus rugs cut and bound to size for majlis and bedrooms.
Screed levelling, moisture checks and underlay. The part nobody sees and the part that determines whether the floor lasts.
Skirting, scotia beading and threshold strips at doorways, so the floor is finished at every edge rather than left with a gap.
How it works
We measure the actual area, check the level and condition of the subfloor, and count the doorways and thresholds that need finishing.
You see the material and get a rate that includes preparation, fitting and finishing rather than covering alone.
Old covering lifted and disposed of, subfloor levelled and checked for moisture, underlay laid.
Floor laid, cuts made at the edges, skirting and beading fitted, thresholds finished at every door.
A single room is usually a day once the material is in. Larger areas depend on how much levelling the subfloor needs — that is assessed at the site measure so it is in the quote rather than added later.
Our work
Photographed in customers' homes and offices around Abu Dhabi.



Why Al Amasi
Our own measuring, workshop and fitting staff — not subcontracted labour hired per job.
Imported fabrics, papers and finishes chosen to survive Abu Dhabi heat, sun and dust.
A date agreed at the quote, and told to you straight if anything threatens it.
Residential and commercial clients across the Emirates, most of whom come back for the next room.
Find us
Hamad Center, 2nd Floor — Shop No. 85
Electra Street, near NMC Hospital
Al Danah — Zone 1, Abu Dhabi, UAE
P.O. Box 13074, Abu Dhabi
Open in Google MapsTell us the rooms and we will come and measure. No charge for the visit and no obligation to order.